Project
Ote Mesa
Bragg Crane & Rigging was hired to lift and install a Siemens generator into an existing building that would not allow the generator to fit in its existing entrance. Bragg Crane & Rigging’s solution was to hoist the generator up above the building with our prime mover, Goldhoffer THPH trailer, 850-Ton gantry and integral propel gantry legs.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |