Bragg Companies

Santa Maria, CA

Corporate Site

Projects

Chevron Column Transportation (SPMT)

Using our Scheuerle SPMT (Self Propelled Modular Transport) and Goldhoffer trailers, Heavy Transport moved two columns thorugh the Chevron, El Segundo refinery. The use of our SPMT and Goldhoffer configuration was a critical choice due to the necessity of navigating the tight turns through confined spaces in the refinery. The columns were 170 and 190 feet long respectively. Bragg Crane Service was waiting for the columns to lift them into place.


Call us:
(805) 922-8544
or email us at brett.parish@braggcrane.com
and our representative will assist you.

OFFICE LOCATION:
1555 E Betteravia,
Santa Maria, CA 93454
Fax: (805) 922-7716